back PREV NEXT

CEM SUBSTATION PSS2

MACAU, CHINA

CEM- COMPANHIA DE ELECTRICIDADE DE MACAU

2016

Design Stage

Infrastructure

RUI LEÃO, CARLOTTA BRUNI

RUI LEÃO, CARLOTTA BRUNI

CATARINA LAMY, HUGO COELHO

CIVIL

The PSS2 was envisioned to be built in the lot located in the embankment of the Nam Van lake road system on Avenida Panorâmica do Lago Sai Van, next to the central viaduct of the Sai Van Bridge. It has a triangular shape with a confrontation to the North and South with the main circulation routes and to the West the Sai Van Bridge viaduct. The land was leased to the CEM concessionaire and its purpose was to build a Transformation Station.